Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3948.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Apr 24, 2007     Floorboards and foot wells - (4.5 hours)       Category: Fuselage
Riveted F-805C angle to front seat floor.

Fabricated rear seat L footwell assembly. Filed, polished, sanded, cleaned, dimpled, primed and riveted all parts together, then clecoed assembly to floorboard.

Test-fit floor and L footwell in fuselage. Noted locations for nutplates (34 of them) that will attach the footwells and front seat floorboard to the fuselage. Filed and trimmed L footwell and floorboard for a perfect fit. Will do some research on which type of screws I'll use to secure the floorboards.

Fabricated rear seat R footwell assembly. Clecoed all parts together.

Marked gear tower sides in preparation for cutting out access hole. (The hole will connect the two lower lightening/access holes. It will be covered by a single access cover fabricated from 0.043 aluminum fastened with approximately 20 screws and nutplates.) Took measurements for fabricating the cover plate.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.